Sync bundled mission-control to upstream 15fbc94

Pulls in 15 upstream commits since the April 3 bundling snapshot
(msieurthenardier/mission-control). Notable changes:

- agentic-workflow rewritten as the "fast" variant: per-leg design and
  implement, single review and commit across the whole flight
- New Skill-Project Boundary section: skills no longer read or write
  project-owned artifacts by literal heading
- routine-maintenance scoped to post-mission only; adds state-machine
  reachability and cache freshness audits
- Test metrics capture threaded through debrief, maintenance, and flight
- Crew prompts no longer carry skill-required instructions; SKILL.md is
  the protocol
- Worktree git strategy removed; standardized on {target-project}
- Jira artifact template removed upstream

Local URL correction in init-project/README.md preserved
(anthropics/flight-control -> msieurthenardier/mission-control).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-18 08:10:32 -07:00
parent 4588bdf40c
commit 7840bddbb4
18 changed files with 318 additions and 565 deletions

View File

@@ -6,7 +6,7 @@ human and project-side agents to capture both execution and design perspectives.
## Crew
### Developer
- **Context**: {project}/
- **Context**: {target-project}/
- **Model**: Sonnet
- **Role**: Provides developer perspective on flight execution. Reviews what was
built, identifies technical debt introduced, evaluates implementation quality,
@@ -14,7 +14,7 @@ human and project-side agents to capture both execution and design perspectives.
- **Actions**: debrief-interview
### Architect
- **Context**: {project}/
- **Context**: {target-project}/
- **Model**: Sonnet
- **Role**: Closes the design feedback loop. Evaluates whether the design decisions
made during flight planning held up in practice. Reviews architectural impact of